When most people think about mining, they picture what comes out of the ground. Senior Backfill Engineer Rebecca Clark spends her days focused on what goes back in.

At our Kathleen Valley Lithium Operation, Rebecca is responsible for paste backfill, from planning and design right through to delivery underground. Paste backfill is made by mixing tailings, the material left over once the process plant has extracted the lithium, with cement. It is then pumped underground to fill the voids we have mined out.

“It’s my job to design how all of that happens, from long-term planning and infrastructure strategy through to the pastefill mix design and getting it delivered where it needs to go,” Rebecca said.

No two days the same

Rebecca’s day starts with a check-in with the paste plant operators and underground crews to see how the plant performed overnight.

“The data and their feedback tell me pretty quickly whether everything went to plan,” she said.

“It’s a dynamic job with a lot of collaboration across different departments, so no two days are the same. Some days are hands-on and operational, heading underground to support the paste crew or troubleshooting an issue at the plant. Others are more technical, like long-term infrastructure planning, backfill strategy and scheduling. There’s always a new problem to solve, and that’s the fun part.”

Keeping the mine moving

Backfill sits on the critical path of the mining cycle. If a stope cannot be filled, the next one cannot be mined, so the whole operation depends on Rebecca’s team delivering.

“My goals are simple: the right strength of fill, delivered at the right rate, safely and efficiently,” she said.

“Optimal backfill is almost invisible. No blockages, no plant downtime, and fill that’s exactly as designed. When it’s running perfectly, no one has to think about it. That’s the goal.”

Paste backfill also has a clear sustainability benefit.

“We’re taking material that would otherwise sit on the surface and putting it back underground, where the rock came from, and that means a smaller footprint on the surface,” Rebecca said.

Solving problems together

Backfill relies on planning, geotechnical, underground crews and the paste plant operations team working closely together, and Rebecca’s role sits right in the middle.

“When a problem comes up, it gets dealt with as a shared one rather than passed around, which means we can respond quickly and keep the operation moving,” she said.

No playbook to follow

Kathleen Valley is the only mine in Australia producing pastefill from lithium tailings, which means the team is writing its own playbook.

“The material behaves in its own way, so we’re learning our own system and dialling it in as we go, rather than copying what someone down the road has already worked out,” Rebecca said.

“On top of that, we’re the biggest paste operation in Australia, with the capacity to produce 320 cubic metres an hour. It’s a constant job of problem-solving and optimising, but that’s exactly what makes it a great place to be an engineer.”